VinFast Car Factory
The first car factory in Vietnam to have a complete, integrated and highly automated production process, making it the most...
Hoa Phat Dung Quat 2
The steel complex project, with an investment of 85,000 billion dong, has a capacity of 5.6 million tons of steel...
The Petrochemical Complex In South
The Southern Petrochemical Complex Project, situated in the southern key economic zone of Ho Chi Minh City - Bien Hoa...
PHU MY ULTRA-WHITE FLOATING GLASS FACTORY
The Phu My Ultra-White Floating Glass factory, located in the expanded Phu My II Industrial Park, Tan Phuoc Ward, Phu...
Woolworths Distribution Centre – Heathwood 1
Steel Builder delivered approximately 1800 tons of pre-engineered buildings and pre-fabricated steel structures for the Heathwood Distribution Centre.
VH4 Factory – ChingLuh Viet Nam
From concept to completion, we delivered the steel backbone of VH4 Factory in 2022, fueling their production of 32 million...
LNG Warehouse 1MMTPA – PV GAS Vung Tau Terminal
Steel Builder designed, fabricated, and installed the steel structure for the PV GAS Vung Tau Terminal LNG 1MMTPA warehouse in...
BW INDUSTRIAL
In 2020, Steel Builder and BW Industrial collaborated to construct a 2,600-ton steel warehouse complex covering 60,000 sqm in Binh...
Levantine Hill Winery 2
In 2019, we delivered 650 tons of Pre-Engineered Buildings and Pre-Fabricated Steel Structures for Levantine Hill Winery 2.
Charter Hall Glendenning Logistics Estate
Steel Builder provided 700 tons of Pre-Engineered Buildings and Pre-Fabricated Steel Structures for the Charter Hall Glendenning Logistics Estate project...
McPhee Distribution Stage 3
Steel Builder supplied 450 tons of Pre-Engineered Buildings and Pre-Fabricated Steel Structures for McPhee Distribution Stage 3, encompassing a new...
Woolworths Distribution Centre old
Steel Builder delivered approximately 1800 tons of pre-engineered buildings and pre-fabricated steel structures for the Heathwood Distribution Centre.
MAPLE TREE – CRESTMEAD LOGISTICS PARK
A new Mapletree facility at Crestmead Logistics Park, part of a master-planned logistics precinct.
SORA GARDENS SC
Steel Builder undertook the fabrication and installation of 2,000 tons of steel structures for SORA Gardens SC, marking the inaugural...
VinFast Car Factory fault
This is the first car factory in Vietnam to have a complete, integrated and highly automated production process, making it...