CENTRAL WAREHOUSE – NGHI SON STEEL MANUFACTURING FACTORY
Steel Builder crafted the central warehouse for Nghi Son's massive steel complex (980,000 tons in 2020), from design to installation.
VH4 Factory – ChingLuh Viet Nam
From concept to completion, we delivered the steel backbone of VH4 Factory in 2022, fueling their production of 32 million...
LNG Warehouse 1MMTPA – PV GAS Vung Tau Terminal
Steel Builder designed, fabricated, and installed the steel structure for the PV GAS Vung Tau Terminal LNG 1MMTPA warehouse in...
BW INDUSTRIAL
In 2020, Steel Builder and BW Industrial collaborated to construct a 2,600-ton steel warehouse complex covering 60,000 sqm in Binh...
Charter Hall Glendenning Logistics Estate
Steel Builder provided 700 tons of Pre-Engineered Buildings and Pre-Fabricated Steel Structures for the Charter Hall Glendenning Logistics Estate project...
LOGOS Cold Storage & Distribution Facility
In 2022, we provided 1,570 tons of Pre-Engineered Buildings and Pre-Fabricated Steel Structures for the LOGOS Cold Storage & Distribution...
McPhee Distribution Stage 3
Steel Builder supplied 450 tons of Pre-Engineered Buildings and Pre-Fabricated Steel Structures for McPhee Distribution Stage 3, encompassing a new...
Woolworths Distribution Centre old
Steel Builder delivered approximately 1800 tons of pre-engineered buildings and pre-fabricated steel structures for the Heathwood Distribution Centre.
MAPLE TREE – CRESTMEAD LOGISTICS PARK
A new Mapletree facility at Crestmead Logistics Park, part of a master-planned logistics precinct.
VinFast Car Factory fault
This is the first car factory in Vietnam to have a complete, integrated and highly automated production process, making it...
MAPLE TREE – CRESTMEAD LOGISTICS PARK
Lorem ipsum dolor sit amet consectetur. Ultrices amet posuere mauris consectetur nulla tempus mauris. Aliquet nisi volutpat fusce dictum duis
CP PAPER WAREHOUSE
CP PAPER JOINT STOCK COMPANY was established by Cherry & Pearl. The first company in the paper industry in Vietnam...
MAPLE TREE – CRESTMEAD LOGISTICS PARK
Lorem ipsum dolor sit amet consectetur. Ultrices amet posuere mauris consectetur nulla tempus mauris. Aliquet nisi volutpat fusce dictum duis
PHOENIX COATING LINE
Lorem ipsum dolor sit amet consectetur. Ultrices amet posuere mauris consectetur nulla tempus mauris. Aliquet nisi volutpat fusce dictum duis
MAPLE TREE – CRESTMEAD LOGISTICS PARK
Lorem ipsum dolor sit amet consectetur. Ultrices amet posuere mauris consectetur nulla tempus mauris. Aliquet nisi volutpat fusce dictum duis